Solution:
Along with adding Bramasol’s inbuilt Disclosure Reporting Package reducing resource time to produce required reports, Bramasol submitted a plan that included two breaks in the overall project plan.
Break (1) allowed AmSty to upgrade their system and conduct a thorough analysis of their lease population
Break (2) provided AmSty to take advantage of Hypercare after the 1st quarter close utilizing CLM as they are not required to report until March 31st, 2020.
How Bramasol Assisted
Bramasol conducted a workshop of FASB 842C and IRFS 16 requirements which included a detailed session of the CLM data upload template. This allowed the client to identify and abstract all required data from their lease contracts during Break (1)